Projects

 

Anglo - Moranbah North Coal
MN953A Moranbah North Coal Umbrella

Project Umbrella Works
Description The project scope includes (but is not limited to) conveyor installations and recoveries, development support, diesel maintenance, ventiation, longwall relocations, secondary support, roadworks and general outbye works.
Safety Performance TRIFR - 17.81 (12 months rolling)
Highlights and achievements
  • Significant cost savings delivered to the client
  • Completed within the allocated budget
  • All works have been completed ahead of schedule

 

Anglo - Moranbah North Coal
Moranbah North Coal Drivage Works

Project Mains and Gateroad Development
Description The project scope includes (but is not limited to) development of Mains and Gateroad Headings in the including fault drivage, stoneworks for overcasts / under passes and conveyor chambers.
Safety Performance TRIFR - 31.08 (12 months rolling)

 

Rio Tinto - Kestrel Coal
4600001348 Mains Development

Project Mains Development – SP5, SP6 and SP7
Description Manning of one development unit to undertake the development of mains headings in the Kestrel 300’s area. The work also includes stone drivage, overcasts and conveyor chambers.
Safety Performance TRIFR – 31.08 (12 month rolling)
Highlights and achievements
  • Received formal recognition from RTCA for our safety performance, professionalism and flexibility within the Rio business
  • Currently within the allocated budget

 

BHP Billiton - Dendrobium Mine
X0502 Dendrobium Development

 

Project Mains and Gateroad Development
Description The project scope includes the manning of one development unit to undertake scheduled development. The works extend to the roadway advance in the main headings and carry out development works in the gate roads depending on the client's production requirements.
Safety Performance TRIFR – 11.41 (12 month rolling)
Highlights and achievements
  • Currently tracking under budget
  • Mastermyne received the BHPIC Contractor Recognition Award for 2009
  • Largest amount of metres cut by a single unit miner within BHP Illawarra FY09

 

 

 

BMA Coal - Crinum East
GC-8355 Ventilation Services

 

Project Ventilation Services
Description The scope of work includes the installation of ventilation control devices, general ventilation repair and service work, stone dusting and the installation and maintenance of tube bundle lines and filters.
Safety Performance TRIFR – 0 (12 month rolling)
Highlights and achievements
  • Completed within the allocated budget
  • All installations completed ahead of schedule

 

 

 

BHP Billiton - West Cliff Mine
P00561 Provision of Outbye Services

Project Provision of Outbye Services
Description The project scope includes the installation of secondary support, outbye services, recovery of pipes, stone dusting, construction and spraying of ventilation devices, and provision of supplementary labour for development and longwall panels including tradesman.
Safety Performance TRIFR – 67.48 (12 month rolling)
Highlights and achievements
  • Increased work force numbers to 70 +
  • Week day night shift crew achieved 855 days injury free

 

Rio Tinto - Kestrel Mine Extension
KME-A-CC03 Drift Construction, Inseam and Panel Development

Project Drift Construction, Inseam Development and Panel Development
Description Redpath Australia Pty Limited and Mastermyne Pty Ltd have entered into an unincorporated joint venture for this project.

Redpath’s scope entails the following:

  • SP1A - The construction of a conveyor drift to access the German Creek coal seam
  • SP1B - The construction of a transport drift to access the German Creek coal seam

Mastermyne’s scope entails the following:

  • SP2 - The establishment of inseam drives to establish primary ventilation circuit, TG 401 drive head area and development of sufficient pit room for multiple development headings.
  • SP3 - In-seam development in a Panel designated by the Company. Separable Part 3 commences when there is an established primary ventilation circuit, secondary egress via the transport drift, and sufficient room for the mining of multiple development headings.