x

Saraji Shed Refurbishment

Back to All ProjectsMastermyne miningMastertec
Project: Saraji Shed Refurbishment
Location: Dysart, QLD
Client: BMA
Value: $800,000
Start Date: May 2016
Finish Date: Oct 2016
Project Description: Saraji Coal Mine is located near Dysart in Central Queensland. As part of the Mine’s maintenance schedule Mastertec was engaged to refurbish the walls, ceilings and floors of the main workshop, tyre bays, bucket shop and all other sheds in the industrial area.

Mastertec prepared the interior wall and ceiling surfaces utilising our Sponge Jet Blaster, an innovative alternative to traditional abrasive blasting methods. The Sponge Jet blaster produces virtually zero dust which was an important consideration in this high traffic environment, the sponge medium is also reclaimable, able to be recycled up to 10 times.

The external walls and floors were prepared utilising high pressure water blasting to achieve the desired profile prior to remediation, application of protective coatings and demarcation of all areas..

Key Statistics

Client: BMA
Value: $800,000
Start Date: May 2016
Finish Date: Oct 2016

What we do

One of the Mastermyne Project Managers travelled across NSW and QLD sites over the last month to present his story on illicit drug awareness and how drugs can effect peoples lives. He decided to share his personal story of how drugs had effected the lives of their family. Under no obligation to do this, he […]